DR6A-D : Check Flowmeter Red
To avoid serious injury follow all warnings and instructions in the manual. Wear appropriate personal protective equipment.
- Check for blockage within the red material flow meter.
- Verify some pressure (10 Bar or more) at the output of red material pump.
- Fix blockage in the flow meter. Add restriction in the line or increase the flow.