F8B2-A : Expected Pulses Flow Meter B

To avoid serious injury follow all warnings and instructions in the manual. Wear appropriate personal protective equipment.

  • Verify that the material outlet ball valve from the machine to the stack is open on the B-side.
  • Verify that the B-side air motor slider valve is open.
  • Verify that the flow meter cable is connected.
  • If the flow rate is too low for the flow meter, increase the flow rate.