P7BX : Pressure Imbalance B High
        
        
    
 
    
    
    
  
  
    To avoid serious injury follow all warnings and instructions in the manual. Wear appropriate personal protective equipment.
   
 
    
    
    
        
            
    
    
    
    
    
    - Ensure material flow is equally restricted on both material lines.
 
 
         
     
 
    
    
        
            
    
    
    
    
    
    - Ensure that the pressure imbalance value, on the System Setup screen, is at an acceptable maximum pressure to prevent unnecessary alarms and abort dispenses.
 
 
         
     
 
    
    
        
            
    
    
    
    
    
    - Fill tanks with material.
 
 
         
     
 
    
    
        
            
    
    
    
    
    
    - Check feed pump and hoses for blockage.  Check that feed pumps have correct air pressure.
 
 
         
     
 
    
    
        
            
    
    
    
    
    
    - Check if heater and PRESSURE RELIEF/SPRAY valve are plugged.  Clear.  Replace rupture disk.  Do not replace with a pipe plug.