P7AX: Pressure Imbalance A
To avoid serious injury follow all warnings and instructions in the manual. Wear appropriate personal protective equipment.
- Refill hoppers/drums with material.
- Ensure material flow is equally restricted on both material lines.
- Ensure that the pressure imbalance value, on the Setup screen, is at an acceptable maximum pressure to prevent unnecessary alarms and abort dispenses.
- Ensure material has been properly conditioned and check hoses for blockage.
- Check if heater and PRESSURE RELIEF/SPRAY valve are plugged. Clear/Replace rupture disk. Do not replace with a pipe plug.